Vienna articulated tram 4-112 "Remi"
OperationalThe history of the tram
Wiener Lokalbahnen (WLB)
Operational
March 24, 1987: Delivered as Vienna articulated tram 4-112 "Remi", manufacturer Simmering-Graz-Pauker (SGP), type Reihe 100, series 101-126, width 2.40 m, length 26.75 m, weight 49.5 t, manufactured 1979-1993, power output 190 kW, max speed 80 km/t.