Lund low-floor articulated tram 02 (Åsa-Hanna)
OperationalTrams from Lund
Select vehicle type: Low-floor articulated trams, and service vehicles.
Low-floor articulated trams from Lund
Select vehicle number: 01 (Sfinxen), 02 (Åsa-Hanna), 03 (Blåtand), 04 (Brandklipparen), 05 (Inferno), 06 (Saxo Grammaticus), and 07 (Lindeman).
The history of the tram
Lund Tramway
Operational
: Delivered as Lund low-floor articulated tram 02 (Åsa-Hanna), manufacturer CAF, type L1, series 01-07, width 2.65 m, length 33.00 m, weight 41.0 t, manufactured 2020, with 40 seats and 160 standing places, 8 engines, power output 70 kW, max speed 70 km/h.

1:44
Join us on the tram's premiere tour in Lund! (2020)Sydsvenskan's video reporter Bengt Arvidson followed the tram Åsa-Hanna's first trip through Lund.By SYDSVENSKAN - .
4:54
Light rail level crossings Solbjer / Swedish light rail level crossings (2026)2025-02-23 The light rail level crossings with traffic lights at the roundabout near Solbjer tram stop at the city of Lund's tramway. Lund is today Sweden's 4th city with a tram system - after Stockholm, Gothenburg and Norrköping - since the line Lund C - ESS opened in 2020. Trams are of model Urbos 3 from Spanish manufacturer CAF and are in Lund classified as L1
The light rail level crossings with traffic lights at the roundabout near Solbjer tram stop at the city of Lund's tramway. Lund is today Sweden's 4th city with a tram system - after Stockholm, Gothenburg and Norrköping - since the line Lund C - ESS opened in 2020. Trams are of model Urbos 3 from Spanish manufacturer CAF and are in Lund classified as L1By Måns Nylind - a level crossing spotter from Sweden - .
Lund tram line 1 with low-floor articulated tram 02 (Åsa-Hanna) at Ideontorvet (2026)By Silas Boye Nissen..

4:28
Lund: The tram as part of urban development in Northern Europe - Episode 5 (2022)0:00 Intro
0:43 Trams in Lund
3:51 Outro
The modern tram system in the swedish city of Lund was opened in December 2020. The new line 1 begins at the railway station, passes the university hospital and runs towards the north-east to the MAX IV and ESS research facilities. In the next few years, the new Brunnshög district will be developed along the route, providing apartments and jobs for up to 40.000 people. In the city center, the construction of the tram was used as an opportunity to redesign the surrounding streets.
For the first line, seven cars of the CAF Urbos 3 type were delivered. More lines are planned.By TramChris - .
6:34
Skånetrafiken - The tramway in Lund (2020)Interview with project manager Håkan Henmyr.By Skånetrafiken - .






