Aarhus low-floor articulated tram 1105-1205
OperationalThe history of the tram
Aarhus Letbane
Operational
2017: Delivered as Aarhus low-floor articulated tram 1105-1205, manufacturer Stadlerrail Werk Pankow, type Variobahn, width 2.65 m, length 32.00 m, weight 41.0 t, manufactured 2016-2017, with 84 seats and 132 standing places, max speed 80 km/t.

March 18, 2018.

June 6, 2018.

April 20, 2019.

April 6, 2020.

September 15, 2020.

August 28, 2021.

August 28, 2021.

April 21, 2022.

January 23, 2023.

September 5, 2023.

September 9, 2023.