Klinikum Olvenstedt (Magdeburg)
There are 8 photos from Klinikum Olvenstedt (Magdeburg) and 3 trams in the direction of Klinikum Olvenstedt (Magdeburg) on Tram Travels.
Magdeburger Verkehrsbetriebe (MVB) stops
Allee-Center, Alte Neustadt, Lostauer Straße, Alter Markt, Ambrosiusplatz, Arndtstraße, Barleber See, Budenbergstraße, City Carré, Cracau, Pechauer Platz, Diesdorf, Friesenstraße, Hauptbahnhof/Kölner Platz, Hauptbahnhof/Willy-Brandt-Platz, Herrenkrug, Heumarkt, IKEA, Industrie- und Logistik-Centrum, Kannenstieg, Klinikum Olvenstedt, Leipziger Chaussee, Messegelände/Elbauenpark, Neustädter See, Nicolaiplatz, Reform, Sudenburg, Kroatenweg, Südring, Universität, Universitätsbibliothek, Westerhüsen, and Westring.
Photos and videos from Klinikum Olvenstedt (Magdeburg)

5:56
Historical Tatra Grand Train Magdeburg (2019)The MVB is building a new tram route on Warschauer and Schönebecker Strasse. Since a canal has to be laid, tram traffic will be interrupted. The Südost depot will also be disconnected from the network as a result.
To ensure that regular service can start operating safely, the Sudenburg museum depot will once again be the vehicle deployment point (of the Südost depot) for a few weeks. To enable the MVB to park 9 low-floor articulated railcars close to the city center during the nightly service breaks, we have cleared the museum depot and transferred many historic vehicles to the Südost depot.
The film shows some driving scenes with the historic Tatra large train and the passage through the construction site on Schönebecker Strasse on July 20, 2019.By MaxRaffael - .
28:34
Magdeburg tram line 5 (2014)Tram line no. 5 Klinikum Olvenstedt -- Messegelände/Elbauenpark in MagdeburgBy esbek2 - .
23:53
Magdeburg tram line 4 (2014)Tram line no. Cracau - Klinikum Olvenstedt in Magdeburg.By esbek2 - .
31:48
Magdeburg tram line 3 (2014)Route of tram line no. 3 Klinikum Olvenstedt - Reform in Magdeburg.By esbek2 - .
31:47
Magdeburg tram line 2 (2014)Route of tram line no. 2 Alte Neustadt - Westerhüsen in Magdeburg.By esbek2 - .
12:20
Magdeburg Tram (2014)Together with
Lucas Scholz: https://www.youtube.com/channel/UCu5P1Aw10W9jHlpbh6vTbLg
Modelltram77: https://www.youtube.com/user/Modelltram77
The Berlin subway: https://www.youtube.com/channel/UCR3ySKs6vy0cRAxyU1CQCiQBy Straßenbahnfreak98 - .
3:17
News from the Magdeburg Tram (2013)A lot is happening at MVB these days. We've been out and about with our cameras at the busiest spots, both in traffic and non-traffic areas, and we have the relevant information.
A lot is happening at the LVB these days. We were out and about with the death machine at the hotspots of traffic and non-traffic events, and we have the relevant information. Even several months after the devastating June floods in Magdeburg, smooth tram operations are out of the question. On the other hand, several projects have been initiated in recent weeks to put the company on a future-proof footing. The main visible damage from the flood has been repaired, but the routes to Lake Barleber See and Herrenkrug are still not in operation. The Breitscheid Straße exhibition grounds section was used until August 20th to park 46 customs vehicles, as well as by the NDT and the football emergency team. The rest of the route towards the Kern Group is slowly growing. From the beginning of August, work commenced on removing the most severe damage to the August Bebel Dam between Korbwärten and Tonart, thereby providing the depot with at least the necessary capacity. However, it is not yet foreseeable to use the mentioned section for passenger traffic temporarily. Extensive investigations are still needed. Only shunting operations at low speed are possible. The line, therefore, only runs between Siegburg and Neue Neustadt. From there, buses run as a rail replacement service to Zumba. Better see. On August 19, provisional workshop operations began in the north. Three workshops are quiet, and about two-thirds of the parking area is available for use for the time being. The rear bypass remains closed. Like the line parked on the Europaring, vehicles have been gradually driven north since August 19, allowing for the regular operation of line 5 to commence from September 2nd. On August 15, the newly constructed stops at Domplatz were put into operation. Also on September 16, the dismantling of the ID card in Regen Weg began. This is the block bypass between the loop and the Leipziger Chaussee buildings.
Therefore, because of the track. Neuber and administrative work in Otto von Guericke Street between Dance and Trance. Construction street costs 5.5 million euros. Line 3 will only run from the town square via Breite Weg, but all day until the reform. We are working on Reden Weg and Otto von Guericke Street. The work is expected to be completed by the end of the year. The symbolic groundbreaking ceremony for construction section two, Wiener Straße, of the second north-south connection took place on September 11th. This was always accompanied by protests from a citizens' initiative that wants to prevent this route. In a week-long game of cat and mouse, posters were repeatedly put up and removed.By Ditmar Pauke - .
5:08
Tram Museum Magdeburg (2010)Welcome to the museum weekend at the Sudenburg depot 2010!
Colorful Magdeburg tram world.
Under this motto, the IGNah e.V. association and the MVB invite you on a trip into Magdeburg tram history on Saturday and Sunday, August 28th and 29th, from 11 a.m. to 5 p.m.
Experience the freshly restored "theater train" made up of railcar 138 and trailer 300 on exclusive presentation trips. On a route steeped in history between the Sudenburg museum depot and Herrenkrug, the city guide and our conductors will provide helpful information and entertaining anecdotes about the city and the tram. We have a little surprise in store for you in the Herrenkrug. The tour starts at 1 p.m. and 3 p.m. from the depot courtyard.
Tickets costing €5 can be purchased in advance at the souvenir stand and from the conductors on the train immediately before the journey begins.
Historic trains take you on line 77 from the museum depot to Elbauenpark, where the OMMMA takes place on Saturday and the OPPA on Sunday.
The route goes via Hasselbachplatz with a change at the main station, through the city center, and over the Strombrücke to the final stop at the exhibition center.
The trips start every hour at minute 14.
At 11:14 a.m., 12:14 p.m., 1:14 p.m., 2:14 p.m., 3:14 p.m., and 4:14 p.m. at the museum depot.
You can get a ticket for the one-way trip from the museum depot to the exhibition center (with one change at the main station) from the conductors in the carriages, which costs 1 euro.
In the former forge and carriage hall, you can view exhibits on tram technology and historic and special vehicles, and read critical historical data about the tram in Magdeburg on information boards. Snacks and drinks will also be provided.
http://ignah.net/ IGNah - Interest group for historical local transport and trams at the MVB e.V.By Eisenach82 - .Location on a map
Trams in the direction of Klinikum Olvenstedt (Magdeburg)
Magdeburg tram line 4 with low-floor articulated tram 1358 near Hauptbahnhof/Kölner Platz (2023)By Henrik Boye..

23:53
Magdeburg tram line 4 (2014)Tram line no. Cracau - Klinikum Olvenstedt in Magdeburg.By esbek2 - .
31:48
Magdeburg tram line 3 (2014)Route of tram line no. 3 Klinikum Olvenstedt - Reform in Magdeburg.By esbek2 - .