Tucson Sun Link: Convento / Congress - Helen / Warren
OperationalCity: Tucson (United States).
Route length: 7.6 km (4.7 miles).
Track gauge: 1435 mm (standard gauge).
Opened: July 25, 2014.
Tram lines in Tucson
Tucson Sun Link: Convento / Congress - Helen / Warren
Operational
Stops
Helen / Warren → Convento / Congress → Congress / Stone → 2nd St / Olive Av → University / Tyndall.

View the route map in high resolution.
Photos and videos of Tucson Sun Link: Convento / Congress - Helen / Warren

Tucson Sun Link with low-floor articulated tram 105 close by University/Tyndall (2024)By Silas Boye Nissen.
December 24, 2024.

Tucson Sun Link with low-floor articulated tram 107 near 2nd St/Olive Av (2024)By Silas Boye Nissen.
December 24, 2024.

Tucson Sun Link with low-floor articulated tram 101 at 2nd St/Olive Av (2024)By Silas Boye Nissen.
December 24, 2024.

Tucson Sun Link with low-floor articulated tram 103 at Congress / Stone (2024)By Silas Boye Nissen.
December 24, 2024.