TRAM TRAVELS

Tucson Sun Link: Convento / Congress - Helen / Warren

Operational

City: Tucson (United States).
Route length: 7.6 km (4.7 miles).

Track gauge: 1435 mm (standard gauge).
Opened: July 25, 2014.

Tram lines in Tucson

Tucson Sun Link: Convento / Congress - Helen / Warren
Operational

Stops

Helen / WarrenConvento / CongressCongress / Stone2nd St / Olive AvUniversity / Tyndall.

Tucson Sun Link: Convento / Congress - Helen / Warren route map

View the route map in high resolution.

Photos and videos of Tucson Sun Link: Convento / Congress - Helen / Warren

Tucson Sun Link with low-floor articulated tram 105 close by University/Tyndall (2024)New foto - added this week
Tucson Sun Link with low-floor articulated tram 105 close by University/Tyndall (2024)By Silas Boye Nissen.
December 24, 2024.
Tucson Sun Link with low-floor articulated tram 107 near 2nd St/Olive Av (2024)New foto - added this week
Tucson Sun Link with low-floor articulated tram 107 near 2nd St/Olive Av (2024)By Silas Boye Nissen.
December 24, 2024.
Tucson Sun Link with low-floor articulated tram 101 at 2nd St/Olive Av (2024)New foto - added this week
Tucson Sun Link with low-floor articulated tram 101 at 2nd St/Olive Av (2024)By Silas Boye Nissen.
December 24, 2024.
Tucson Sun Link with low-floor articulated tram 103 at Congress / Stone (2024)New foto - added this week
Tucson Sun Link with low-floor articulated tram 103 at Congress / Stone (2024)By Silas Boye Nissen.
December 24, 2024.

Add a comment

Last updated: May 14, 2025.