Szczecin extra line 10: Gumieńce - Las Arkoński
OperationalCity: Szczecin (Poland).
Route length: 11.9 km (7.4 miles).
Driving time: 36 min.
Track gauge: 1435 mm (standard gauge).
Opened: 1988.
The line is operated by
Tramwaje Szczecińskie
Operational
Lines in Szczecin
Select line type: Tram lines, extra lines, museum lines, special event lines, and tourist lines.
Extra lines in Szczecin
Szczecin extra line 4: Plac Szyrockiego - Plac Żołnierza Polsk
Operational
Szczecin extra line 10: Gumieńce - Las Arkoński
Operational
Szczecin extra line 8BIS
Closed
Stops

View the route map in high resolution.