Sumgait tram line 1: Himcombinat - Rynok
ClosedCity: Sumgait (Azerbaijan).
Route length: 8.6 km (5.3 miles).
Track gauge: 1524 mm.
Opened: March 11, 1959.
Closed: July 2003.
The line was operated by
Sumgait
Closed
Tram lines in Sumgait
Stops
Himcombinat → Rynok.

View the route map in high resolution.