Ostrava tram line 9: Poruba, Vřesinská - Vozovna Křivá
ClosedCity: Ostrava (Czech Republic).
Route length: 12.6 km (7.8 miles).
Driving time: 23 min.
Track gauge: 1435 mm (standard gauge).
Opened: July 1, 1974.
Closed: December 15, 2019.
The line was operated by
Dopravní podnik Ostrava (DPO)
Operational
Lines in Ostrava
Select line type: Tram lines, extra lines, night lines, and special event lines.
Tram lines in Ostrava
Ostrava tram line 1: Hlavní nádraží - Dubina
Operational
Ostrava tram line 2: Hlavní nádraží - Výškovice
Operational
Ostrava tram line 3: Dubina - Poruba Vozovna
Operational
Ostrava tram line 4: Nová huť jižní brána - Martinov
Operational
Ostrava tram line 5: VŠB-TUO - Budišovice, Zátiší
Operational
Ostrava tram line 6
Operational
Ostrava tram line 7
Operational
Ostrava tram line 8: Hlavní nádraží - Poruba, Vřesinská
Operational
Ostrava tram line 11: Poruba Vozovna - Zábřeh
Operational
Ostrava tram line 12
Operational
Ostrava tram line 15
Operational
Ostrava tram line 17: Dubina - Vřesinská
Operational
Ostrava tram line 9: Poruba, Vřesinská - Vozovna Křivá
Closed
Stops
VŠB-TUO → Poruba, Vřesinská → Vozovna Křivá → Poruba Vozovna → Telekomunikační škola → Náměstí Republiky → Elektra.

View the route map in high resolution.