Messina tram line 28: Museo - Bonino
OperationalCity: Messina (Italy).
Route length: 7.8 km (4.8 miles).
Driving time: 40 min.
Track gauge: 1435 mm (standard gauge).
Opened: April 3, 2003.
The line is operated by
Azienda Trasporti Messina (ATM)
Operational
Tram lines in Messina
Messina tram line 28: Museo - Bonino
Operational
Messina tram line 1
Closed
Messina tram line 2
Closed
Messina tram line 7
Closed
Messina tram line 8
Closed
Messina tram line 9
Closed
Stops
Museo → Bonino → Repubblica (Messina Centrale) → Cairoli.

View the route map in high resolution.
Photos and videos of Messina tram line 28: Museo - Bonino

September 19, 2022.

September 19, 2022.

September 19, 2022.

September 13, 2022.

September 3, 2022.

September 9, 2017.

September 9, 2017.

August 4, 2009.

August 4, 2009.

August 4, 2009.

August 4, 2009.

2004.

2003.