Mainz tram line 50: Römerquelle - Bürgerhaus
OperationalEarlier: Mainz tram line 10.
City: Mainz (Germany).
Route length: 14.6 km (9.1 miles).
Driving time: 43 min.
Track gauge: 1000 mm (metre gauge).
Opened: 1922.
The line is operated by
Mainzer Mobilität
Operational
Lines in Mainz
Select line type: Tram lines, and extra lines.
Tram lines in Mainz
Mainz tram line 50: Römerquelle - Bürgerhaus
Operational
Mainz tram line 51: Poststraße / Finthen - Hindemithstraße / Lerchenberg
Operational
Mainz tram line 52: Bahnstraße/Bretzenheim - Am Schinnergraben
Operational
Mainz tram line 53: Bürgerhaus - Hindemithstraße / Lerchenberg
Operational
Mainz tram line 7: Kostheim Siedlung - Mombach
Closed
Mainz tram line 1
Closed
Mainz tram line 2
Closed
Mainz tram line 3
Closed
Mainz tram line 4
Closed
Mainz tram line 5
Closed
Mainz tram line 6
Closed
Mainz tram line 9
Closed
Stops
Römerquelle → Bürgerhaus → Zwerchallee / Phönix-Halle → Bismarckplatz → Lessingstraße → Nerotalstraße → Hauptbahnhof → Viermorgenweg → Kapellenstr. / G.Cen. → Elbestraße → Münsterplatz → Schillerplatz.

View the route map in high resolution.
Photos and videos of Mainz tram line 50: Römerquelle - Bürgerhaus

July 7, 2010.

April 6, 2009.

April 4, 2009.

July 4, 2003.

February 2001.

1970.