Liberec tram line 3: Lidové sady - Horní Hanychov
OperationalCity: Liberec (Czech Republic).
Route length: 8.8 km (5.5 miles).
Driving time: 26 min.
Track gauge: 1000 mm (metre gauge).
Opened: December 13, 1924.
Closed: September 1, 1990.
Track gauge: 1435 mm (standard gauge).
Opened: September 1, 1990.
The line is operated by
Dopravní podnik měst Liberce a Jablonce nad Nisou (DPMLJ)
Operational
Lines in Liberec
Select line type: Tram lines, extra lines, museum lines, and regional lines.
Tram lines in Liberec
Liberec tram line 3: Lidové sady - Horní Hanychov
Operational
Liberec tram line 4
Closed
Stops
Lidové sady → Horní Hanychov → Fügnerova → Rybníček → Nádraži → Viadukt → Dolní Hanychov.

View the route map in high resolution.