TRAM TRAVELS
3

Gera tram line 3: Lusan / Zeulsdorf - Bieblach-Ost

Operational

City: Gera (Germany).
Total route length: 12.2 km (7.6 miles).
Driving time: 33 min.

Track gauge: 1000 mm (metre gauge).
Opened: .

Lines in Gera

Select line type: Tram lines, extra lines, and special event lines.

Tram lines in Gera

1Gera tram line 1: Zwötzen - Untermhaus
Operational

3Gera tram line 3: Lusan / Zeulsdorf - Bieblach-Ost
Operational

Stops

Lusan/ZeulsdorfBieblach-OstHeinrichstraßeSorge/MarktOststraße.

Gera tram line 3: Lusan / Zeulsdorf - Bieblach-Ost route map

View the route map in high resolution.

Photos and videos of Gera tram line 3: Lusan / Zeulsdorf - Bieblach-Ost

Tram in Gera (2021)
12:47
Tram in Gera (2021)I still remember the Wiesenstrasse "hopped down" the Wiesenstrasse is in thick traffic.By Hunde - .
Gera Tram (2015)
5:23
Gera Tram (2015)Gera has the second oldest electric tram in Germany and it was opened on 22 February 1892nd The GVB has 3 lines which are served by 12 NGT8G, 6 and 28 KT4D KTNF8. Currently there are the Geraer transport companies in an insolvency proceeding.By Straßen-und Eisenbahn Deutschland - .
Gera tram line 3 with articulated tram 309 at Oststraße (2015)Gera tram line 3 with articulated tram 309 at Oststraße (2015)By Henrik Boye.
.
Gera tram line 3 with articulated tram 351 at Bieblach-Ost (2015)Gera tram line 3 with articulated tram 351 at Bieblach-Ost (2015)By Henrik Boye.
.
Gera tram (2014)
14:55
Gera tram (2014)Tram on line 3 and line 1. Lusan and center area. Car type: KT4DMC, KTNF8+KT4DMC and NGT8G.By Tatra477 & Tram-MD - .
Gera tram line 3 with articulated tram 311 at Heinrichstraße (2014)Gera tram line 3 with articulated tram 311 at Heinrichstraße (2014)By Henrik Boye.
.
Gera tram line 3 with articulated tram 348 at Sorge/Markt (2014)Gera tram line 3 with articulated tram 348 at Sorge/Markt (2014)By Henrik Boye.
.
Gera tram line 3 with articulated tram 351 at Heinrichstraße (2014)Gera tram line 3 with articulated tram 351 at Heinrichstraße (2014)By Henrik Boye.
.
Documentary OnTour Tram Gera (2013)
35:07
Documentary OnTour Tram Gera (2013)Join us on a 35-minute journey on the Gera tram. GVB operates three lines in Thuringia's third-largest city. They use both Tatra vehicles from CKD and Alstom low-floor trams. In addition to the main line 3, which connects the northeast and southwest every five minutes, there are two supplementary lines, 1 and 2, and in the depot, you'll find a few very special vehicles that you wouldn't normally expect to find here... The NVP team welcomes you to our report on Gera's on-tour operations. We are at the Heinrichstraße stop, the central hub of the GVB network. But first, let's get an overview of the entire Gera network. Line 1 connects the districts of Unterm Haus and Zwozen in 10 minutes, stopping at 13 locations along a 20-minute route. Usually, only low-floor NGT8G vehicles are used here. Line 2, however, does not stop at Heinrichstraße and runs exclusively in the southern part of the city. It connects Loser, Zeulsdorf, and Zwozen Bahnhof in 30 minutes with a single service, taking 10 minutes to reach its new stops. The Fußbrücke stop connects to line 3, which heads toward the city center. Line 3, not only the longest route but also the most frequent in the GVB network, connects Biblach Ost in the north with destinations every 5 minutes. Lusan has 25 stops and a travel time of 34 minutes. At Lusan Brüte, the 5-minute cycle is broken, so only every other service continues to Zollsdorf. This is also the only line still using the Tatra trams, as we will see later. You can always track our current location using the pearl necklace displayed on our site. Here, you can see the GVB rail grinding car, which is common on the network, especially during winter. Shortly after leaving Heinrichstraße, line 3 crosses a building on its way to Sorgemarkt. Unusually, the tunnel consists of two consecutive tubes separated by a pedestrian zone and crossing, with no crossing possibility for pedestrians—they need to go around the building via the pedestrian zone. We are at that pedestrian crossing between the tunnels. The light at the end of the tunnel is Heinrichstraße. Sorgemarkt gets its name from the nearby shopping street, though it does not border the tram route, but is behind the houses here. You can also take the tram from there—the old town and town hall are reachable via a short walk. We are now between the "Sorgarkt" stop and the next, "Leipziger Straße." Here, line 3 leaves the backyard and soon crosses the northern end of the pedestrian zone. From Leipziger Straße, we’ll take a ride toward Berufsakademie. The next stop is "Straß über ja Kön wir auchchäiter," followed by "Berufslichkeit z." [Applause] We’ve now traveled a significant part of line 3, reaching the southern section at the "Fehrbrücke" stop. Here, line 3 meets line 2, which only runs in the south. The switches to the right lead to the depot and are not used during normal operation. From the pedestrian bridge that gives the stop its name, you get a good overview. Let's go up there. The route continues into Lusan via Laune Brüte and finally to Zeulsdorf. From there, you can see the Gleisdreieck railway station again. The route straight ahead belongs to line 2. Our picture of the month for April is being taken now—we are at the Lusan Brüte stop or loop. As mentioned earlier, the 5-minute break on line 3 is broken here. Until a few years ago, line 2 also ended at this loop, but rising passenger numbers extended its route further to Zollsdorf. Drivers usually have only one break at most loops, and only one service runs in the loop, leaving little buffer. Now we are at the southern terminus of Lusan Zeulsdorf—the stops are a bit further forward, and the actual loop begins just a few meters behind. [Applause] Here, we see a vehicle on line 2, which is the only service that operates the route alone all day. From Zollsdorf, we’ll take you on a ride to Lusan Laune. Last stop, next stop: Relle to a rerß next halstellea lau ST. I disappear. We’ve now changed routes to line 2 at GVB Betriebshof. Here, we see an old friend— the rail grinder.By nahverkehrsportal - .
Gera tram, low-floor articulated railcar (2011)
6:01
Gera tram, low-floor articulated railcar (2011)Tram views in October 2011.By Mahufi11 - .
The tram in Gera (2011)
7:37
The tram in Gera (2011)The Wiesestrasse was closed, and the traffic was shared.By EEPSpieler - .
Gera Tram - Impressions (2010)
12:14
Gera Tram - Impressions (2010)Compilation of various videos of the Gera tram.By 777whitestone - .
Gera Trams (2010)
6:00
Gera Trams (2010)A trailer for http://www.pmpfilms.com/index.html, the worlds largest range of transport films, see website for shopping, links and list.By DaveSpencer32 - .
Ride in the driver's cabin Line 2 - Gera and its tram (2009)
17:54
Ride in the driver's cabin Line 2 - Gera and its tram (2009)Gera and its tram - ride in the driver's cabin on line 2. The stops for a direct journey: 2:15 GVB depot 3:20 Lusan triangular junction 4:10 pedestrian bridge 6:15 Lusan/Laune 7:15 Zeulenrodaer Straße 8:40 Lusan/Brüte 10:25 Lusan/Brüte 11:40 Zeulenrodaer Straße 12:55 Lusan/Laune 14:40 pedestrian bridge 15:25 Lusan triangular junction 16:25 GVB depotBy Vakuumverduenner - .
Ride in the driver's cabin Line 3 - Part 1/2 - Gera and its tram (2009)
35:13
Ride in the driver's cabin Line 3 - Part 1/2 - Gera and its tram (2009)Also free for Blu-ray Disc. More information at www.peter-ruppert.de The stops for a direct journey: 1:45 Bieblach Ost 2:50 Ernst-Abbe-Straße 3:50 Hilde-Coppi-Straße 5:10 Heidecksburgstraße 7:35 Berufsakademie 8:45 Tinz 9:50 Grüner Weg 11:05 Straße des Bergmanns 12:40 Herderstraße 13:40 Friedrich-Engels-Straße 15:05 Leipziger Straße 16:40 Sorge/Markt 19:15 Heinrichstraße 20:45 Park der Jugend 22:05 An der Spielwiese 23:25 Oststraße 24:35 Südfriedhof 25:40 Schenkendorfstraße 27:00 Keplerstraße 28:45 Pedestrian bridge 30:20 Lusan/Laune 31:25 Zeulenrodaer Straße 32:45 Brüte 34:05 Bruno-Brause-StraßeBy Vakuumverduenner - .

Add a comment

Last updated: .