Darmstadt extra line 2: Hauptbahnhof (Platz der Deutschen Einheit) - TU-Lichtwiese/Campus
OperationalCity: Darmstadt (Germany).
Route length: 5.3 km (3.3 miles).
Track gauge: 1000 mm (metre gauge).
Opened: November 24, 1897.
The line is operated by
HEAG mobilo
Operational
Lines in Darmstadt
Select line type: Tram lines, extra lines, and fast lines.
Extra lines in Darmstadt
Darmstadt extra line 1: Eberstadt Frankenstein - Alsbach Am Hinkelstein
Operational
Darmstadt extra line 2: Hauptbahnhof (Platz der Deutschen Einheit) - TU-Lichtwiese/Campus
Operational
Darmstadt extra line 4
Operational
Darmstadt extra line 10
Operational
Stops
Hauptbahnhof (Platz der Deutschen Einheit) → TU-Lichtwiese/Campus → Rheinstraße/Neckarstraße → Luisenplatz.
View the route map in high resolution.