Christchurch Tramway line
OperationalCity: Christchurch (New Zealand).
Route length: 3.6 km (2.2 miles).
Driving time: 35 min.
Track gauge: 1435 mm (standard gauge).
Opened: February 4, 1995.
Closed: February 22, 2011 because of earthquake.
Reopened: November 2013.
The line is operated by
Christchurch Tramway
Operational
Lines in Christchurch
Select line type: Tram lines, restaurant lines, and tourist lines.
Tourist lines in Christchurch
Christchurch Tramway line
Operational
Stops
Christchurch Tramway → New Regent Street.

View the route map in high resolution.
Photos and videos of Christchurch Tramway line

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

February 9, 2023.

January 7, 2011.

January 7, 2011.

January 7, 2011.

January 7, 2011.

January 7, 2011.

2010.

2010.

2010.