Brussels Tourist Tramway
OperationalCity: Brussels (Belgium).
Route length: 39.3 km (24.4 miles).
Driving time: 240 min.
Track gauge: 1435 mm (standard gauge).
Closed: October 26, 2020 because of COVID-19.
Reopened: November 19, 2020.
The line is operated by
Brussels Intercommunal Transport Company (MIVB/STIB)
Operational
Brussels Tram Museum (MSVB/MTUB)
Open regularly
Lines in Brussels
Select line type: Tram lines, extra lines, museum lines, and regional lines.
Museum lines in Brussels
Brussels Tourist Tramway
Operational
Stops

View the route map in high resolution.
Photos and videos of Brussels Tourist Tramway

May 31, 1997.

1995.

September 10, 1989.

June 19, 1989.

July 21, 1985.

April 15, 1985.