Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
OperationalCity: Brandenburg an der Havel (Germany).
Route length: 8.4 km (5.2 miles).
Driving time: 23 min.
Track gauge: 1000 mm (metre gauge).
Opened: February 1, 1955.
The line is operated by
Verkehrsbetriebe Brandenburg an der Havel (VBBr)
Operational
Lines in Brandenburg an der Havel
Select line type: Tram lines, christmas lines, and extra lines.
Tram lines in Brandenburg an der Havel
Brandenburg an der Havel tram line 1: Hauptbahnhof - Anton-Saefkow-Allee
Operational
Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord
Operational
Brandenburg an der Havel tram line 9: Hauptbahnhof - Hohenstücken Nord
Closed
Brandenburg an der Havel tram line 3
Closed
Brandenburg an der Havel tram line 4
Closed
Brandenburg an der Havel tram line 5
Closed
Stops
Hauptbahnhof → Hohenstücken Nord → Jacobstraße → Hauptstraße → Steinstraße → Neustädtischer Markt.

View the route map in high resolution.
Photos and videos of Brandenburg an der Havel tram line 6: Hauptbahnhof - Hohenstücken Nord

July 15, 2024.

July 10, 2011.

July 10, 2011.

2007.

July 31, 2001.