Brandenburg an der Havel extra line 2: Hauptbahnhof - Quenzbrücke
ClosedCity: Brandenburg an der Havel (Germany).
Route length: 7.4 km (4.6 miles).
Driving time: 22 min.
Track gauge: 1000 mm (metre gauge).
Opened: April 16, 1911.
Closed: February 10, 2020.
The line was operated by
Verkehrsbetriebe Brandenburg an der Havel (VBBr)
Operational
Lines in Brandenburg an der Havel
Select line type: Tram lines, christmas lines, and extra lines.
Extra lines in Brandenburg an der Havel
Brandenburg an der Havel extra line 2: Hauptbahnhof - Quenzbrücke
Closed
Brandenburg an der Havel extra line 12: Anton-Saefkow-Allee - Quenzbrücke
Closed
Stops
Hauptbahnhof → Quenzbrücke → Hauptstraße → Neustädtischer Markt.

View the route map in high resolution.
Photos and videos of Brandenburg an der Havel extra line 2: Hauptbahnhof - Quenzbrücke

2007.

July 31, 2001.

July 31, 2001.

July 31, 2001.

April 27, 1991.

April 27, 1991.