TRAM TRAVELS
B

Bordeaux tram line B: France Alouette - Berges de la Garonne

Operational

City: Bordeaux (France).
Total route length: 20.0 km (12.4 miles).
Driving time: 52 min.

Track gauge: 1435 mm (standard gauge).
Opened: .

Tram lines in Bordeaux

ABordeaux tram line A: Le Haillan Rostand - La Gardette Bassens Carbon Blanc
Operational

BBordeaux tram line B: France Alouette - Berges de la Garonne
Operational

CBordeaux tram line C: Villenave Pyrénées - Gare de Blanquefort
Operational

DBordeaux tram line D
Operational

EBordeaux tram line E
Operational

FBordeaux tram line F
Operational

Bordeaux tram line 1
Closed

Bordeaux tram line 2
Closed

Bordeaux tram line 3
Closed

Bordeaux tram line 4
Closed

Bordeaux tram line 5
Closed

Bordeaux tram line 6
Closed

Bordeaux tram line 7
Closed

Bordeaux tram line 8
Closed

Bordeaux tram line 9
Closed

Bordeaux tram line 10
Closed

Bordeaux tram line 11
Closed

Bordeaux tram line 12
Closed

Bordeaux tram line 13
Closed

Bordeaux tram line 14
Closed

Bordeaux tram line 15
Closed

Bordeaux tram line 16
Closed

Bordeaux tram line 17
Closed

Bordeaux tram line 18
Closed

Bordeaux tram line 19
Closed

Bordeaux tram line 20
Closed

Bordeaux tram line 21
Closed

Bordeaux tram line 22
Closed

Bordeaux tram line 23
Closed

Bordeaux tram line 24
Closed

Bordeaux tram line 25
Closed

Stops

Berges de la GaronneFrance AlouettePessac CentreCité du VinQuinconces Fleuve.

Bordeaux tram line B: France Alouette - Berges de la Garonne route map

View the route map in high resolution.

Photos and videos of Bordeaux tram line B: France Alouette - Berges de la Garonne

Trams in Bordeaux, France (2016)
11:06
Trams in Bordeaux, France (2016)The Bordeaux tramway network consists of three lines (A, B, C) with a total length of 58.9 km (June 2015). Line D is in the planning stage, and the Médoc Tram-train line is under construction. A BHNS line E, currently in the planning stage, could complete the network. The first line of Bordeaux's modern tramway opened on 21 December 2003; further extensions have increased the route length to 43.9 kilometres (27.3 mi). The system is notable for using a ground-level power supply of the Alimentation par Sol (APS) system in the city centre. Keolis Bordeaux has operated it since 1 May 2009.By Timosha21 - .
Tram traffic in Bordeaux (2015)
7:54
Tram traffic in Bordeaux (2015)Impressions of the Bordeaux tram system, which has been in operation since 2003. The vehicles run on overhead lines outside the city center, and on an insulated central conductor rail with overhead power supply within the city. A French band's soundcheck can be heard in the background. ---------------------------------------------- Detailed information about each individual vehicle in this video can be found in the credits at the end of the video! You may need to pause the text for a while! ---------------------------------------------- BEFORE YOU GIVE THIS VIDEO A NEGATIVE RATING, PLEASE GIVE ME CONSTRUCTIVE CRITICISM!By Dr. Drehstrom - .
Bordeaux Tramway (2014)
3:45
Bordeaux Tramway (2014)Video of the Bordeaux Tramway.By g4shf - .
Tramway Bordeaux France (2010)
5:43
Tramway Bordeaux France (2010)The new Bordeaux tramway network has been open since 2003. To preserve the city's historical center, overhead power lines have been banished. A third rail supply powers the tramways. A video by trainstrain1.By Closely Observed Railways - .

Add a comment

Last updated: .