Besançon tram line T1: Hauts du Chazal - Chalezeule
OperationalCity: Besançon (France).
Route length: 13.4 km (8.3 miles).
Driving time: 42 min.
Track gauge: 1435 mm (standard gauge).
Opened: August 30, 2014.
The line is operated by
Ginko
Operational
Tram lines in Besançon
Besançon tram line T1: Hauts du Chazal - Chalezeule
Operational
Besançon tram line T2: Hauts du Chazal - Gare Viotte
Operational
Besançon tram line 1
Closed
Besançon tram line 2
Closed
Besançon tram line 3
Closed
Besançon tram line 4
Closed
Besançon tram line 5
Closed
Stops

View the route map in high resolution.