TRAM TRAVELS
6

Augsburg tram line 6: Friedberg West P+R - Stadtberget

Operational

City: Augsburg (Germany).
Total route length: 11.5 km (7.1 miles).
Driving time: 23 min.

Track gauge: 1000 mm (metre gauge).
Opened: .
Closed: .
Reopened: .
Closed: .
Reopened: .

Lines in Augsburg

Select line type: Tram lines, extra lines, museum lines, and special event lines.

Tram lines in Augsburg

1Augsburg tram line 1: Lechhausen Neuer Ostfriedhof - Göggingen
Operational

2Augsburg tram line 2: Haunstetten Nord - Augsburg West P+R
Operational

3Augsburg tram line 3: Hauptbahnhof - Köningsbrunn Zentrum
Operational

4Augsburg tram line 4: Oberhausen Nord P+R - Hauptbahnhof
Operational

6Augsburg tram line 6: Friedberg West P+R - Stadtberget
Operational

5Augsburg tram line 5
Closed

7Augsburg tram line 7
Closed

13Augsburg tram line 13
Closed

64Augsburg tram line 64: Friedberg West P+R - Oberhausen Nord P+R
Closed

Stops

Friedberg West P+RHauptbahnhofStadtbergetKönigsplatz.

Augsburg tram line 6: Friedberg West P+R - Stadtberget route map

View the route map in high resolution.

Photos and videos of Augsburg tram line 6: Friedberg West P+R - Stadtberget

Augsburg Tram: Impressions in August with Combino and CityFlex (2011)
9:50
Augsburg Tram: Impressions in August with Combino and CityFlex (2011)Recorded on August 4th and 10th. During the holidays, the M8C vehicle types from Duewag and the ADtranz GT6M are no longer needed, so unfortunately, I was unable to film them. During school and university time, they are used in reinforcement courses; otherwise, only the 7-car Combino vehicles from Siemens and CityFlex from Bombardier can be found.By trams_trains - - .
Augsburg tram: Travel on line 6 (new line) in the CityFlex (2010)
13:28
Augsburg tram: Travel on line 6 (new line) in the CityFlex (2010)P+R Friedberg West to the University of Applied Sciences.By trams_trains - .

Add a comment

Last updated: .