Augsburg tram line 1: Lechhausen Neuer Ostfriedhof - Göggingen
OperationalCity: Augsburg (Germany).
Total route length: 10.6 km (6.6 miles).
Driving time: 34 min.
Track gauge: 1000 mm (metre gauge).
Opened: .
Closed: .
Reopened: .
Lines in Augsburg
Select line type: Tram lines, extra lines, museum lines, and special event lines.
Tram lines in Augsburg
Augsburg tram line 1: Lechhausen Neuer Ostfriedhof - Göggingen
Operational
Augsburg tram line 2: Haunstetten Nord - Augsburg West P+R
Operational
Augsburg tram line 3: Hauptbahnhof - Köningsbrunn Zentrum
Operational
Augsburg tram line 4: Oberhausen Nord P+R - Hauptbahnhof
Operational
Augsburg tram line 6: Friedberg West P+R - Stadtberget
Operational
Augsburg tram line 5
Closed
Augsburg tram line 7
Closed
Augsburg tram line 13
Closed
Augsburg tram line 64: Friedberg West P+R - Oberhausen Nord P+R
Closed
Stops
Lechhausen Neuer Ostfriedhof → Göggingen → Königsplatz → Moritzplatz.

View the route map in high resolution.
Photos and videos of Augsburg tram line 1: Lechhausen Neuer Ostfriedhof - Göggingen

Augsburg tram line 1 with articulated tram 8001 near Königsplatz (2010)By Birger Agertoft Andersen..
Augsburg tram line 1 with low-floor articulated tram 852 at Königsplatz (2010)By Birger Agertoft Andersen..
Augsburg tram line 1 with low-floor articulated tram 852 near Königsplatz (2010)By Birger Agertoft Andersen..
Augsburg tram line 1 with low-floor articulated tram 852 on Königsplatz (2010)By Birger Agertoft Andersen..
Augsburg tram line 1 with low-floor articulated tram 872 near Königsplatz (2010)By Birger Agertoft Andersen..
Postcard: Augsburg tram line 1 with articulated tram 416 on Klausenberg (1996)Augsburg City Utilities, eight-axle articulated tramcar GT 4 No. 416, in August 1996 in Augsburg-Göggingen,
Machinery Esslinger 1959 (modernized by Gerätebau Mittenwalde 1996), 1A'A1, 2 x 100 kW, top speed = 60 km/h
City of Augsburg, articulated tramcar GT 4 No. 416 in August 1996 at Augsburg-Göggingen.By Der Bahnladen, Henrik Boye, Wolfgang Walper - .



