Antalya AntRay T1
OperationalCity: Antalya (Turkey).
Route length: 42.9 km (26.7 miles).
Track gauge: 1435 mm (standard gauge).
Opened: December 2009.
The line is operated by
Antalya Ulaşim
Operational
Tram lines in Antalya
Antalya AntRay T1
Operational
Antalya Nostalji Tramvayi T2: Müze - Zerdaillik
Operational
Stops
Fatih → Varsak → EXPO → Atatürk → Doğu Garaji.

View the route map in high resolution.
Photos and videos of Antalya AntRay T1

March 21, 2014.

March 21, 2014.