We built platforms at Glostrup Station (2020) Stop: Glostrup . YouTube name: Hovedstadens Letbane . Date: October 20, 2020 . City: Copenhagen (Denmark).
1:48
VIDEO
Hovedstadens Letbane Operational
In week 49, our contractor, Aarsleff Rail, began laying the concrete elements for the upcoming light rail station at Glostrup Station. Glostrup Station will be the largest station on the light rail route, with over 6,000 passengers on a weekday. Filip Dichmann, Interface and Site Manager at the Capital's Light Rail, tells more about the work in the film.
Add a comment Location on a map
Photos from Hovedstadens Letbane 4:53
Danish Light Rail in Copenhagen - Capital City Light Rail - Siemens Avenio (2026) The return of trams to the Danish capital region.
Opened in two stages in October 2025 and August 2026.
The Letbane light rail line runs from Ishøj in the south to Lundtofte in the north.
This footage from August 2026 shows the first section of the line, Ishøj - Glostrup - Rødovre Nord, just a few days before the ribbon-cutting for the new, long northern section to Herlev, Lingby, and Lundtofte.
The unified fleet consists of 29 double-ended Siemens Avenio trams.
The return of trams to the Danish capital after the closure of the original Copenhagen tram system in spring 1972. The modern Letbane operates as a western bypass in the west of the capital. By Trains and Trams -
August 26, 2026 .
2:32
The capital's light rail seen from Glostrup Station (2024) DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuth's Way
Dirch Passers All
KU.BE
Dalvangsvej.
Roskilde Road.
The skeleton.
25.25 meters.
Modular train.
HCS.
25,25
GoPro.
Paul Bergsøe's Road
The main road
Valby
Rödover
Brøndby
M Larsen
Shell car
Home trip
The skeleton
Ålholm Square
Dalvangsvej
Glostrup
Way
Copenhagen
Rödover
White over
Brøndby
Paul Bergsøe's Road
Hissingvej
Hissing
Motor ring 3
Roskilde Road
Korsdalsvej
Brøndbyöstervej
Avedøre Havnevej
Tower Road
Damhus Boulevard
Damhustorvet
Peter Bang's Way
Valby Langgade
Ålholm Square
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Eva's All
Shell Brondby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bishop's arch
Nordre Fasanvej
The Bishop's Palace
Borups Everyone
Lundtoftegade
The capital's light rail
Odense Light Rail
Aarhus Light Rail
Aarhus
The Ejby bridge bunker
West rampart
Nordre Ring road 3
Old country road
separate ring road 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
November 4, 2024 .
2:18
This is how we build the capital's light rail (2018) Construction of the capital's new light rail has begun slowly. But how do you build a light rail? You can learn more about that in this film. The capital's Light Rail is set to open in 2025, featuring 29 new stations between Ishøj and Lyngby. By Hovedstadens Letbane -
December 10, 2018 .
21:39
Test run of the capital's light rail - Day 1 (2024) On 14 August, Hovedstadens Letbane started test runs with their train set on the section between the control center and Glostrup Station. The test runs took place at low speed, and measuring the distance between the platform and the train was particularly important. By NoahsTrainsDK -
August 15, 2024 .
1:11
Copenhagen Capital City Light Rail at Glostrup (2025) DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers All
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
siemens mobility Avenio Tram
DSB
Train
Flintholm Alle
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers Alle
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Letbane
odense Letbane
Århus Letbane
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Light Rail
odense Light Rail
Århus Light Rail
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
August 29, 2025 .
9:53
Opening of the Light Rail Directed Sound (2025) #Letbanen
October 26 was a big day. Now we can say welcome to the Letbanen which will run from Ishøj station to Rødovre north.
From the summer of 2026 it will run all the way to Lundtofte.
Instagram t_for_tog
Music Swaying Silhouettes - Nathan Moore
Top Of The Morning - TrackTribe
Get Outside! - Jason Farnham By T for Tog -
November 2, 2025 .
1:34
Capital City Light Rail (2025) The Capital Light Rail opened its first section in the fall of 2025. From Ishøj to Rødovre.
The next section will open in the summer of 2026. By saxjensen -
November 24, 2025 .
11:18
Greater Copenhagen Light Rail (2026) Capital City Light Rail
Glostrup Station (15/06/2026)
Ishøj & Vallensbæk Station (17/06/2026)
Rødovre Nord Station (19/06/2026)
Light rail Line L
Light rail type:
Siemens Avenio
00:00 Intro
00:09 Glostrup Station
05:37 Ishøj Station
07:38 Destination arrival
07:57 Vallensbæk Station
08:41 Rødovre Nord Station
11:07 Outro
Like and subscribe, thanks for watching
Like and subscribe, thanks for watching By XKWRCK 25KVAC -
June 21, 2026 .
11:13
Inauguration of the Light Rail to Lundtofte (2026) On Saturday, August 22, the northern part of the Light Rail was inaugurated in Lundtofte. Thus, the entire Light Rail is now open for its full length from Ishøj to Lundtofte. The northern stage of the Light Rail is now open, with 4 stops in Herlev. There are Herlev Syd, Herlev, Herlev Bymidte, Herlev Bymidte, and Herlev Hospital. In Gladsaxe, there are 6 stops. There are stops at Dynamovej, Gladsaxe Trafikplads, Gladsaxevej, Gladsaxe Rådhus, Buddinge, and Gammelmosevej; in Lyngby-Taarbæk, there are 7 stops. There are Lyngby, Lyngby Centrum, Fortunbyen, Akademivej DTU, Anker Engelunds Vej DTU, Rævehøjvej, and Lundtofte. If you want to know where the stations that have already opened are, you should go down and watch the video from the opening of the southern part of the Light Rail; there is a link in the video message. It was free to ride the Light Rail all day. It was also free to ride the 300S bus; it was the last trip the 300S ran because the Light Rail took over the route. Then the inauguration train arrives at Rødovre Nord Station. The inauguration train departs from Rødovre Nord at 10:30. Here at Herlev Station, you can change to the H and C trains. And in the future you can walk up the stairs here and down to the S train. In the future, you will also be able to raise your hand and shout "hello". Okay, I can't pull it here either, but try to see here — the soft spot. It's about the fact that there is a soft spot. Try to see here: if you take the soft spot and break it, you can move on quickly. The Light Rail stops right by Herlev Hospital. At some of the Light Rail stations, people were standing around handing out Light Rail merchandise. There were a whopping 50,000 passengers that day, which you could clearly see. At Gladsaxe Traffic Square, you could get free ice cream, an extra-large ball of caramel and stracciatella. We are standing here with three people in power, the people who are probably also very happy with the Light Rail. What do you really think about the Light Rail stopping six times in Gladsaxe — that's even less than what the 300S did. I actually think that's very nice. What do you think about the Light Rail running through the whole thing before it ends in Lundtofte, and then on to Nærum by S-train? It's not so good that the 300S route has been closed. Yes, that's what it is. We can feel it on the Light Rail, and I think that's really cool. And now we're going to discuss what people actually think about the Light Rail. Personally, I think it's good for the environment, and that's a really nice thing. It's there. I would also think it'd be nice if the 300S bus ran a little longer. I think the Light Rail is a super cool means of transport, and it's very environmentally friendly. I agree with that too. Thank you. The day the Light Rail opened was also Gladsaxe Day. The Light Rail was very delayed on opening day because of the large number of people who had turned up. Now we have reached Buddinge Station on the Light Rail, and here you can change to the Buddinge train — the B train towards Farum — up on the bridge. At Lyngby Station you could get tasters. Here we are at Lyngby, where you can change to the E train towards Holte and the A train towards Hillerød. It was actually the last place on the Light Rail with a connection to the S trains. It is the northernmost stop, DTU, so you can get off here to go to DTU. The sign is right there, so it's easy to find. Now it's time to take the Light Rail all the way from Lundtofte to Ishøj; there are 28 stations over 28 km. The itinerary says it will take 1 hour and 8 minutes. Today we saw a crowded Light Rail. It has also been fun to see, even though it has been so crowded. We had to wait a long time, and the system couldn't quite figure it out either. Now I'm excited to see how much time it will take. This should be seen as rush hour. We are ready to see how the Light Rail will cope. I think it will be a pretty wild ride. It has been quite stressful just being inside the Light Rail. I think so too, but it has been forgotten. You don't just move while, but an hour and 8 minutes is only 10 minutes faster than the 300S was. You have to remember that. Let's figure it out and see what it ends up with. I'm starting now. We have driven. Right outside Lundtofte Station, we encountered a queue of three Light Rails, following each other. So we've reached the end of this video, and we've found that when there are many passengers, the Light Rail is 8 minutes slower. Normally it takes 1 hour and 8 minutes to run this stretch with 29 stations, but today it took 1 hour and 16 minutes — so 8 minutes longer. I have a little challenge for you out there: We're going to see if we can get T for Togkanalen up to 1000 subscribers before the end of the year — that is, before January 1, 2027. Here's a video about the train, and over here on the S-train, you can click to subscribe to T for Togkanalen for free. By T for Tog -
August 29, 2026 .
Hovedstadens Letbane .
Last updated: November 20, 2026 .