The light rail's green train - Siemens Avenio (2023) YouTube name: Hovedstadens Letbane . Date: August 25, 2023 . City: Copenhagen (Denmark).
The video shows Hovedstadens Letbane Operational
Read more Read less Description Siemens Mobility, which supplies the trains for Hovedstadens Light Rail, has produced this fine mood film, which shows our beautiful green Avenio trains in the most elegant way.
Read more Read less Stops Glostrup → Rødovre Nord → Control and Maintenance Center .
2:26
VIDEO
Add a comment Location on a map
Photos from Hovedstadens Letbane 1:26
The Greater Copenhagen Capital Light Line, Glostrup and Brøndby (2025) DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers All
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Letbane
odense Letbane
Århus Letbane
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
July 18, 2025 .
2:13
The light rail's first test run (2024) Follow along and see Hovestaden's Light Rail run its first test run on the section between the Light Rail's control and maintenance center and Glostrup Station. By Hovedstadens Letbane -
August 29, 2024 .
2:38
Come on a tour and see the work at Glostrup Station (2020) There is a lot of construction work going on at Glostrup Station, and we took a trip past the construction site to get an overview of the many activities. There we caught Cihad Dönmez, engineer and construction manager at Hovedstadens Light Rail, who in the video below talks about the construction work over the autumn and winter. By Hovedstadens Letbane -
October 7, 2020 .
2:09
The capital's light rail in traffic (2024) Driving along the capital's light rail isn't very complicated. Follow the light regulations, and we will all pass through traffic safely. At the same time, efforts have been made to reduce the interruption of crossing traffic caused by the light rail train.
The capital's light rail has 29 stations between Ishøj and Lundtofte, with trains arriving every five minutes during the day, every 10 minutes in the evenings, and on Sundays. There are 63 traffic lights along the route, so light rail trains should ideally encounter green lights as often as possible to stay on schedule. A very advanced and intelligent signaling system at the traffic lights ensures this. The system is aware of the trains' locations on the route and the time it takes for them to pass through an intersection. It also monitors the rest of the traffic using radars and video. The system uses this information to adjust the green lights, ensuring that as much traffic as possible clears before the light rail train arrives at an intersection, and thus often receives a green light. This allows light rail trains to frequently receive the green light before reaching the intersection, letting them proceed without slowing down.
However, in some cases, light rail trains will stop at a red signal. When this happens, crossing traffic continues to have a green light before the train can get a new green and proceed. How this works in practice depends on whether the train is driving on the side of the road or in the middle, or if it is changing sides at an intersection. When the train is on the side of the road, there will be a green light for cars and bicycles going straight ahead, even if other vehicles are turning across the train’s path and are on red. When the train is in the middle of the road, both straight-going traffic and vehicles turning right from the same direction will have a green light. If the train changes sides at an intersection, only the train moves while other traffic waits. There will always be traffic signals indicating whether it is your turn or the light rail’s turn to go. This system ensures the safety of all road users as they pass through intersections on the light rail route. When the light rail reaches an intersection, its green light period ends, and crossing traffic resumes. This way, everyone can cross quickly and safely. See you in the Capital City Light Rail. By Hovedstadens Letbane -
May 14, 2024 .
1:10
Copenhagen's light rail, Glostrup Ring 3 (2024) Hovedstadens light rail 13 / 9 - 2024 Glostrup Ring 3
DSB
Train
Flintholm Everyone
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuth's Way
Dirch Passers All
KU.BE
Dalvangsvej.
Roskilde Road.
The skeleton.
25.25 meters.
Modular train.
HCS.
25,25
GoPro.
Paul Bergsøe's Road
The main road
Valby
Rödover
Brøndby
M Larsen
Shell car
Home trip
The skeleton
Ålholm Square
Dalvangsvej
Glostrup
Way
Copenhagen
Rödover
White over
Brøndby
Paul Bergsøe's Road
Hissingvej
Hissing
Motor ring 3
Roskilde Road
Korsdalsvej
Brøndbyöstervej
Avedøre Havnevej
Tower Road
Damhus Boulevard
Damhustorvet
Peter Bang's Way
Valby Langgade
Ålholm Square
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Eva's All
Shell Brondby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bishop's arch
Nordre Fasanvej
The Bishop's Palace
Borups Everyone
Lundtoftegade
The capital's light rail
Odense Light Rail
Aarhus Light Rail
Aarhus
The Ejby bridge bunker
West rampart
Nordre Ring road 3
Old country road
separate ring road 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
September 13, 2024 .
1:25
Rigshospitalet Glostrup and trams (2025) Exciting to see 2 trams meet right outside the hospital on the way home - and race one all the way to the intersection By Hans Jørn Storgaard Andersen -
June 25, 2025 .
2:48
Traffic film: Status of the work at the Hovedvejskrysset (2021) The Hovedvejskrysset - or Ringvejskrysset - in Glostrup Municipality is the largest and busiest intersection along the light rail line. Therefore, it is one of the intersections that requires careful planning, both during the current construction phase and the upcoming operational phase, when the light rail comes into service. By Hovedstadens Letbane -
May 31, 2021 .
1:31
The light rail station at Glostrup Station (2022) The light rail is going to hold behind Motorola. The construction work is approx. halfway and now the fitting out of the actual platforms and train systems begins. By Letbanen i Glostrup -
September 11, 2022 .
2:36
Herlev Light Rail (2020) The light rail is on its way :-p
A short time ago, in a town unimaginably close by, the city's ruler, Mayor Thomas, decided to do something new. He wanted a light rail. No, not a lightsaber - a light rail. The idea was to bring customers and prosperity to town, along with new taxpayers. And so this vision took off. By Lars Holgersen -
May 18, 2020 .
15:33
Greater Copenhagen Light Rail in Operational Simulation (2/3) - Glostrup to Brøndbyvester (2025) It's not long now until the Greater Copenhagen Light Rail opens its first phase, between Rødovre Nord and Ishøj St. In the lead-up to the Light Rail's approval, an operational simulation will be carried out to test the entire system. I will try to document these runs, from Rødovre to Ishøj.
In this second episode, we take a closer look at the future traffic hub—and, likely, the largest station on the Light Rail network: Glostrup Station. The station is a Rebroussement station, where trains can only enter from one track, making it a good spot to observe the light rail. We wrap up the video in Brøndbyvester, where the light rail intersects with the Køge Bugt Motorway and the new High-Speed Rail. By NoahsTrainsDK -
September 4, 2025 .
See all photos from Hovedstadens Letbane .
Last updated: March 22, 2026 .