Oden to Odense (2022) YouTube name: Arne Lund . Date: June 13, 2022 . City: Odense (Denmark).
The video shows Odense Light Rail Operational Odense Light Rail: Tarup Center - Hjallese Station Operational Odense low-floor articulated tram 08 "Eventyret" , manufacturer Stadlerrail Werk Pankow, series 01-16, width 2.65 m, length 42.00 m, manufactured 2020.
Read more Read less Description On May 28, 2022, the Odense Light Rail was inaugurated. On that occasion, an updated version of Ode to Odense was performed by Sanne Gryholt and Nalle on the big stage at Flakhaven in Odense.
Read more Read less Stops ODEON → Albani Torv → Bilka .
3:51
VIDEO
Add a comment Location on a map
Photos from Odense Light Rail 45:33
Bus & Rail Observations of Odense, Denmark 🇩🇰 (2024) Recordings of intercity & regional bus and tram service through the city of Odense on the Danish island of Funen
https://beta.rejseplanen.dk/en
00:00 Odense Banegård Central Station Nord (or "North") from Thomas B. Thriges Gade
02:36 Odense Banegård Central Station Syd (or "South") from Østre Stationsvej
09:11 ODEON station - Letbane (Light Rail/Tram)
20:47 Albani Torv - Letbane (Light Rail/Tram)
27:53 University of Southern Denmark - Letbane (Light Rail/Tram)
31:16 Parkering Odense Syd(FlixBus stop)
38:35 Idrætsparken at Nature Energy Park Stadium (from Richard Møller Nielsen Plads)
44:53 Bolbro - Letbane (Light Rail/Tram)
If you're a New Yorker or enjoy visiting New York, specifically the borough of Queens, get involved with the 𝙌𝙪𝙚𝙚𝙣𝙨𝙇𝙞𝙣𝙠 proposal idea to repurpose and develop the elevated viaduct along 100th Street near Woodhaven Boulevard. The Ⓜ️🟠 train will be rerouted from Queens Boulevard subway at Rego Park and connect to the Rockaway branch at Ozone Park, thus the Ⓜ️🟠 train will link commuters to ✈JFK Airport and the Rockaways. With all of this being said... There are no guarantees of success without your help and commitment to get involved and donate. By MJofLakelandX ᴮᴬᴸᵀᴵᴹᴼᴿᴱ ᵀᴿᴬᴺˢᴵᵀ -
February 15, 2025 .
19:50
Inauguration of Odense Light Rail (2022) Odense light rail was inaugurated on 28 May 2022, and the first train with passengers ran from the station called Parkering Odense Syd, which is located east of Hjallese. The Odense light rail was expected to open at the end of 2020, but the coronavirus and other longer-lasting issues were not in place. In contrast to the Aarhus light rail, the Odense light rail first waited for approval before announcing an opening date. And it must be said that it was a good solution, so that you did not end up with a cancellation at the last minute. In this film, we see clips from the opening day, information about the design, and a bit of history from Odense Sporveje.
Today is May 28, 2022. I am at Hjallese Station, on my way to the Park & Ride facility south of Odense. I won a seat on Odense Letbane's first passenger train, which departs at 10:45 a.m. The trip is non-stop to Tarup, where the mayor and the Minister of Transport will board for the return trip. The first passenger light rail train left from the Odense Syd parking station, east of Hjallese. This station houses the light rail workshop, operated by Keolis, which also manages light rail in Odense and Aarhus. Odense light rail was scheduled to open at the end of 2020, but delays caused by the coronavirus and other long-term approvals pushed back the opening. Unlike Aarhus light rail, Odense waited for approval before announcing an opening date. This proved to be a good decision, preventing last-minute cancellations. At 10:20, the first light rail train in Odense arrived at the platform at the Park & Ride facility, ready to depart with passengers. - I recommend passengers stand up and hold onto the brackets and handrails until they get used to the train's rhythm. On the way to Tarup, I’ll share a little about the design of the new light rail. My name is Janik Frithioff, and I am a graphic designer at Odense Light Rail, where I have worked since 2017, contributing to station and train designs. We're here on train set number 01, named Brunneren. You can see it’s a very bright train with inviting colors, creating a cozy atmosphere, complemented by clear signage. This includes displays and signage along the train. The seats are made of cotton from Kvadrat in Ebeltoft, and the handrails are very visible, painted in subtle colors that won’t pollute the design. Several measures have been taken to make the train appear simple, inviting, and warm. The colors of Odense—sidewalks and buildings—are all warm tones, reflecting the city's palette. The color of our train represents Odense but is intentionally distinct from the cityscape. For blending in, darker colors are used, like the black overhead power poles, whereas the train's light color makes it stand out. We chose green for the emergency door opener—one of the few places in Denmark where this color is used to symbolize an emergency exit, aligning with requirements that emergency signs be green, even though German standards for train construction have red. We investigated and received approval to make it green, which indicates an emergency exit rather than a fire hazard. All communication in our trains and stations is in Danish and English. Our call center has a direct line to stations offering English translation. Signage and announcements are bilingual. The seats are soft and comfortable, unlike the hard seats found in metros or other transit modes. We prioritize quality to give citizens a better experience, even on short trips. We believe in providing high-class public transportation with comfortable seating, smooth rides, and an attractive visual environment. The trains also have large flex spaces for bicycles and strollers. Initially, these spaces were smaller, with a row of seats removed and replaced by foldable seats to increase capacity for bikes, wheelchairs, and prams. Then we arrived in Tarup Center, where many passengers were gathering for the first official train departure. Here, both the mayor and the Minister of Transport boarded for the return trip, with small inauguration ceremonies at each station, where ribbons were cut. At Albani Torv, many people waited for the first two trains arriving simultaneously. - It was fantastic. Lots of happy people. - Silent? - At least, there was only happiness. After that, the last ribbon was cut. And afterward, H.C. Andersen welcomed everyone to the City of Fairy Tales. In ancient fairy tales, the poet writes, "YES!" In millennia, they will come. By Kennys Film -
May 28, 2022 .
21:33
Impressions from Odense Light Rail (2025) Impressions from Odense Light Rail on June 7, 2025. Taken at the stops Hjællese St., Campus Odense, Østerbæksvej, Albani Torv, Tarup Center and Bolbro. By Möve Zockt - Gaming, Trainspotting und mehr -
June 7, 2025 .
13:17
Odense light rail | Trip report | Vlog 191 (2023) Vlog 191: Odense light rail between IKEA Odense and Hjallese and IKEA Odense and light rail runs only between IKEA and Hjallese and Odense light rail runs with carriages type Variobahn from Stadler.
Contains in video:
00:00 intro
00:14 Maps
00:22 Odense light rail towards IKEA Odense
00:39 Bilka Odense
00:50 Bilka Odense - IKEA Odense
02:05 IKEA Odense
02:14 Arrival by Odense light rail From IKEA Odense
02:26 IKEA Odense
02:34 IKEA Odense - Bilka Odense
03:17 Bilka Odense
03:26 Bilka Odense - University of Southern Denmark
05:35 University of Southern Denmark
05:43 University of Southern Denmark - Parking Odense South
06:16 parking Odense South
06:26 Parking Odense South - Hjallese station
07:44 Hjallese station
07:53 Arrival by Odense light rail From IKEA Odense
08:05 Hjallese station
08:13 Hjallese station - Bilka Odense
11:53 Bilka Odense
12:01 Bilka Odense - IKEA Odense
12:51 IKEA Odense
12:59 Arrival by Odense light rail From Hjallese station
13:11 The end By MBC og EVC TRAINSPOTTING. DK Denmark. -
July 2, 2023 .
See all photos from Odense Light Rail .
Last updated: May 27, 2026 .