Greater Copenhagen Light Rail to Lundtofte (2026) Added September 30, 2026 YouTube name: XKWRCK 25KVAC . Date: September 10, 2026 . City: Copenhagen (Denmark).
11:05
VIDEO
Hovedstadens Letbane Operational Copenhagen light rail line L: Ishøj - Lundtofte Operational
Copenhagen Capital City Light Rail from Lyngby to Lundtofte, Line L.
Light rail type: Siemens Avenio L3-126.
00:00 Intro
00:09 Siemens Avenio L3-126
01:00 Departure from Lyngby
01:35 Arriving in Lyngby Centrum
02:23 Departure from Lyngby Centrum
03:37 Arrival in Fortunbyen
04:00 Departure from Fortunbyen
05:15 Arriving at Akademivej DTU
06:05 Departure from Akademivej DTU Akademivej DTU
06:37 Arriving at Anker Engelunds Vej DTU
07:29 Departing from Anker Engelunds Vej DTU
08:25 Arriving at Rævehøjvej
08:58 Departing from Rævehøjvej
09:25 Arriving at Lundtofte
10:54 Outro
Lyngby → Lundtofte .
Add a comment Location on a map
Photos of Copenhagen light rail line L: Ishøj - Lundtofte 3:03
Capital City Light Rail First Run - Inauguration (2025) DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers All
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
siemens mobility Avenio Tram
DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers All
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Letbane
odense Letbane
Århus Letbane
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Letbane
odense Letbane
Århus Letbane
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
October 26, 2025 .
1:14
Tram to Ishøj (2025) The day after the tram from Ishøj to Glostrup Nord began operating, I pulled myself together and drove the same route to get a picture of the wonder.
It was a bit difficult to steer and photograph at the same time, but never mind. By Hans Jørn Storgaard Andersen -
October 27, 2025 .
4:53
Danish Light Rail in Copenhagen - Capital City Light Rail - Siemens Avenio (2026) The return of trams to the Danish capital region.
Opened in two stages in October 2025 and August 2026.
The Letbane light rail line runs from Ishøj in the south to Lundtofte in the north.
This footage from August 2026 shows the first section of the line, Ishøj - Glostrup - Rødovre Nord, just a few days before the ribbon-cutting for the new, long northern section to Herlev, Lingby, and Lundtofte.
The unified fleet consists of 29 double-ended Siemens Avenio trams.
The return of trams to the Danish capital after the closure of the original Copenhagen tram system in spring 1972. The modern Letbane operates as a western bypass in the west of the capital. By Trains and Trams -
August 26, 2026 .
1:34
Capital City Light Rail (2025) The Capital Light Rail opened its first section in the fall of 2025. From Ishøj to Rødovre.
The next section will open in the summer of 2026. By saxjensen -
November 24, 2025 .
11:18
Greater Copenhagen Light Rail (2026) Capital City Light Rail
Glostrup Station (15/06/2026)
Ishøj & Vallensbæk Station (17/06/2026)
Rødovre Nord Station (19/06/2026)
Light rail Line L
Light rail type:
Siemens Avenio
00:00 Intro
00:09 Glostrup Station
05:37 Ishøj Station
07:38 Destination arrival
07:57 Vallensbæk Station
08:41 Rødovre Nord Station
11:07 Outro
Like and subscribe, thanks for watching
Like and subscribe, thanks for watching By XKWRCK 25KVAC -
June 21, 2026 .
Copenhagen light rail line L: Ishøj - Lundtofte .
Photos from Hovedstadens Letbane 0:45
Greater Copenhagen Light Rail Glostrup along Ring 3 (2024) Siemens mobility Avenio Tram
DSB
Train
Flintholm All
CBS
Sweeper
Holder
Bemab G1
Olvald Helmuths Vej
Dirch Passers All
KU.BE
Dalvangsvej.
Roskildevej.
Skelet.
25.25 meters.
Modular truck.
HCS.
25.25
GoPro.
Paul Bergsøes Vej
Main Road
Valby
Rødover
Brøndby
M Larsen
Skallebil
Home Trip
Skellet
Ålholm Plads
Dalvangsvej
Glostrup
Road
Copenhagen
Rødover
Hvidover
Brøndby
Paul Bergsøes Vej
Hvissingevej
Hvissing
Motorring 3
Roskildevej
Korsdalsvej
Brøndbyøstervej
Avedøre Havnevej
Tårnvej
Damhus Boulevard
Damhustorvet
Peter Bangs Vej
Valby Langgade
Ålholm Plads
Ålholmvej
Ålholm St.
Valby
NCC
Vibeholms Allé
Tavleholmsvej
Evas Alle
Shell Brøndby
McDonald's
Gopro
Frederiksberg
Finsensvej
Hillerødgade
Ågade
Bispeengbuen
Nordre Fasanvej
Bispeengen
Borups Alle
Lundtoftegade
Hovedstadens Letbane
odense Letbane
Århus Letbane
Aarhus
Ejbybrobunkeren
Vestvolden
Nordre Ring vej 3
Gammel landevej
søndre ring vej 3 By Martin Wegge Vendelbo Lindevall. (GoPro Be a HERO Cams.) -
September 13, 2024 .
4:30
Drone film tour along the light rail (2023) Would you like to know precisely where the green light rail train will debut?
During the spring, our drone photographer filmed along the light rail's future route. The film shows both the status of the construction and the beautiful surroundings surrounding the light rail.
Take a look and enjoy the trip from Ishøj to Lundtofte in less than five minutes. By Hovedstadens Letbane -
August 25, 2023 .
1:20
A trip down the ramp to Glostrup Station (2022) On its trip between Ishøj and Lundtofte, the light rail will stop at a total of six S-train stations, including Glostrup Station, which has required an extraordinary amount of construction work. From the bridge on Søndre Ringvej, the light rail train will be taken all the way down to the station via a long ramp, so that you can easily and quickly change between light rail, S-train and buses.
As I said, it is no easy task to build a ramp of that caliber, but now the work is finally finished, and Per Aarsleff's drone operator, Per Hansen, has documented it in the most beautiful way.
In the video you can e.g. see how Per Aarsleff has made the foundations for the future traffic flow masts, built the light rail alignment on the Ringvejsbroen and on the ramp, where shards have also been laid for the light rail's future tracks. And at the end of the ramp at Glostrup Station you can see that elements have also been built for the future light rail platforms. By Hovedstadens Letbane -
October 24, 2022 .
0:56
Ishøj St. from above (2023) Our contractor M.J. Eriksson A/S, which builds the light rail in Ishøj Municipality, is in full swing building the future light rail station at Ishøj Station.
In the video, you can see how the island platform looks at the moment, and how the first concrete elements for the rails have already been laid from the station out onto Ishøj Stationsvej. By Hovedstadens Letbane -
February 3, 2023 .
Hovedstadens Letbane .
Last updated: November 14, 2026 .