Capital City Light Rail – Test Runs (2025)
YouTube name: MBC og EVC TRAINSPOTTING. DK Denmark..
Date: .
City: Copenhagen (Denmark).

Hovedstadens Letbane
Operational
Copenhagen low-floor articulated tram 109, manufacturer Siemens, type Avenio, series 101-129, width 2.65 m, length 36.90 m, manufactured 2024-2025, with 64 seats and 194 standing places, max speed 70 km/h.
🚋 Capital Light Rail – Siemens Avenio Test Runs August 12, 2025 🚋
Experience Capital Light Rail during the test runs only from Ishøj and Glostrup – with a focus on the new Siemens Avenio light rail trains!
On August 13, 2025, the modern, low-floor Avenio trains rolled out onto the line, and we caught them in action at both Ishøj Station and Glostrup Station. The Avenio trains are known for their stylish design, low energy consumption and high comfort, and in the video you see them glide quietly into the stations, accelerate onto the tracks and pass at full speed.
📍 Filmed exclusively in Ishøj and Glostrup.
🚆 Perfect for train enthusiasts and everyone who is looking forward to the light rail opening in 2025.